One thing I did that was new and different with this quilt was I tried a fusible batting. In the end I would say the review is mixed. The quilt feels stiff to me, in spite of its flannel backing. On the other hand, in spite of the fact that this quilt has languished unfinished for several years, the bonding held up pretty well; I did not need to rebaste the borders.
Once that was done, then I was casting about for the next project. I ironed the flannel I had planned for the back of the Disappearing 4-Patch, but when I measured, it wasn't quite large enough. I looked at John Flynn's method of making a backing with a diagonal seam, but that didn't seem to do the trick either. So I'll hunt for a different fabric the next time I'm in Monroe.
Then I got out the Super 9-Patch baby quilts and their prospective flannel backs, and that was the same deal - not quite large enough. So those ended up going back to the table as well. In the end I pulled out a quilt I had basted last summer that was made with blocks from a block swap. It, too, had been intended all along as a charity quilt, so it's time has come. It's all going to be straight-line quilting, mostly in the ditch, so I decided that would be the next project. I seem to be in quilt-it-and-finish-it mode, which is not the worst place to be. In the morning I'll look at thread options and get bobbins wound and all that good stuff.
Sunday, May 29, 2011
Saturday, May 28, 2011
Friday, May 27, 2011
After I finished sewing on the binding tonight, I decided I needed to get the table cleared off for the next big job, which is the binding on the double wedding ring. On one corner of the table were some blocks for a tesselated flower quilt that I'm contemplating, so I decided to do a little more sewing and have a bigger sample of both versions, so that I can hopefully make a decision about which to use.
I should have pictures of the scrap quilt tomorrow. Meanwhile I'm off to watch one of my favorite moves - Men in Black.
Monday, May 23, 2011
The first step was cutting backing and batting squares.
Then comes the fun part - digging into the bin of scraps and pulling out the first strips.
When I was done, I had a block that looked like this.
The next step was to run a narrow zig-zag all around the outside edge of the block.
flop around and be uncooperative, firmly sewn down. The other is that it compresses the seam allowance, which will make doing the sashing easier.
Then it was time to trim and square up the squares:
I found when I went to do this that my block was now slightly smaller than 9 inches because the stitching had caused it to draw up just a little. Since I was only concerned that the blocks be the same size, and not that they be exactly 9 inches, I just trimmed them to 8 3/4 and was happy with that. If the exact size mattered in a project, I would start with a background square about half an inch larger than that size.
A couple of times when I was digging through the scraps I came across strip sets left over from some other project. I just treated them the same as if they were a single fabric and worked them right in. I even found some orphan blocks that I sewed together into a strip and incorporated. And if I had a piece of fabric I wanted in the center of the block but it wasn't long enough, I sewed another fabric to it and created a custom strip. The only thing I was careful about was making sure the very last strip in the corner wasn't too narrow; I didn't want a lot of seam bulk in that place, or a piece of fabric that was too small to really be seen once the sashing was added to the final blocks.
Once I had the 20 blocks I needed for the quilt finished I put them up on the design wall and laid them out in a pattern. Then I did a "background check." I turned each block over in place on the wall, so that I could see how all the different backing fabrics related to each other. I didn't want two pieces nearly the same color adjacent to each other, and I didn't want obvious directional fabrics turned sideways. I made the changes I wanted, then turned the blocks to the front again,
Now I'm in the process of adding the sashing. I'm using the technique Sharon Pederson outlines in her book Reversible Quilts: Two at a Time, so I won't show all the steps. Here is the top row of the quilt with all the sashing strips machine stitched in place. All that's left is to hand stitch the free edge down. Since this is to be a charity quilt, and I'm interested in getting it finished (as well as pretty), I may opt for a machine zig-zag or other decorative stitch instead.
I have learned several things in the process of making this quilt. One is that I need another scrap bin for my more "mature" fabrics, the ones with more subtle colors. I have pulled several pieces out as I have worked my way through this quilt that just don't play well with this bright color palette. They will find their way into other types of quilts. I have also learned that I really like making this type of quilt. The blocks are like potato chips; you just have to have one more. And the best part is that I don't end up with yet another unquilted top to deal with; once it's assembled it's ready to be bound and done. And since my scrap bin is clearly overflowing, I know there will be more of these quilts made before the summer is over. Especially since the tornadoes seem to keep coming.
Tuesday, May 03, 2011
Monday, May 02, 2011
Today I finished the Disappearing 4-Patch. It took about an hour to sew the chunks together, and another hour to add the borders, and it was done.
Sunday, May 01, 2011
I did find in sewing the blocks together that I had to pay more attention to orientation than I had thought at first. I should have done the pin in the upper left corner before I took anything down from the design wall, but I muddled through the hard way.
The one thing I did differently with this quilt that seems to have made a difference in the end was that I pressed the seams open. I know it violates some sort of rule, but with all the turning of pieces, I wasn't sure how the seams would end up in adjoining blocks. I think in the end it saved some grief. We'll see how it looks in the finished quilt.
Now I've worked too late and I'm tired. I'll finish up tomorrow and see what else I can get done before I have to deal with reality on Tuesday.
Saturday, April 30, 2011
Here's the process, more or less. If you want to see more, there are several other tutorials out there on the web, such as: http://sewwonderful.blogspot.com/2010/02/disappearing-4-patch-or-4-to-9-patch.html. You start with a 4-patch. I started with 6-inch squares.
Once you have a 4-patch, you lay it on the cutting board and proceed to cut it into a 9-patch.
Once the 4-patch is cut into 9-pieces, take the middle piece on each side and rotate it 180 degrees. You end up with something that looks like this:
Then all you have to do is sew it together like any 9-patch, and you're done. Add a bunch of other blocks and you have something like this:
A couple of thoughts about the cutting of the 4-patch. This is definitely a time where "measure twice, cut once" comes into play; don't ask me how I know this. The other thing is that you really don't want to pick up the pieces part way through cutting the block. I have a small cutting board (it shows green on top of my big blue mat in the pictures) that I can rotate so I don't have to stand on my head to cut in the horizontal. It also helps that I can use a rotary cutter equally well in either hand, but that's not essential.
This quilt will end up with 24 blocks, plus a border if I can find something in stash that I like. I suspect this will be a place to use one of the stripes or directional prints I rejected as my main fabric. I'm hoping to have the whole thing put together by the end of the day tomorrow. I have another new project waiting in the queue that I'm itching to start on, so I want this one off the design wall as soon as possible.
Friday, April 29, 2011
But this weekend, while not a official retreat, seems to be making up for it. Both yesterday and today I've made good progress, and since the rest of the weekend seems to be relatively quiet, I should be able to continue on as I have begun.
The Tilted Stars is finally assembled.
Now I have to decided what to work on next. The Yellow Brick Road is at least half quilted, and for the same reasons, I am feeling compelled to finish it. But I don't want to start on it until morning; I want to be fresh when I work on something that's a bit outside my comfort zone. I have a couple of ideas for scrap quilts, but I suspect I'll spend most of the night cutting and not get a lot of actual sewing done. I guess I'll just pull out some boxes and see what strikes my fancy. There should be something I can finish and maybe take to the longarmer with Tilted Stars.
Monday, March 14, 2011
So I'm doing it again. Thursday is the start of the NCAA basketball tournament, and it's the perfect time for a quilt retreat. I don't know that I'll get in quite as much time over 5 days as I did in February, but that doesn't matter. The point is to set a time and a goal, and work toward accomplishing it.
MJ will be here, and that can be both good news and bad news. I know she wants to put a few stitches into the DWR, so we can work on that for a while. And I really want to show her Kay's new shop in Vicksburg, so I may have to kidnap her for an afternoon and drive down there. I'm sure I can find something that I desperately need that will justify the time and the gas to go there.
So what about goals? Here's a good start:
1. Finish sewing the Tilted Stars together. Half of it is in blocks of 16 already, and the layout is fixed, so that should be doable.
2. Put in 5 hours on the DWR (1 per day). I think my fingers are up to this.
3. Finish the embellishment of the Spring Wall Hanging. Most of this is hand-sewing and fiddling until I get a layout I like.
4. 15 minutes per day of cleaning.
5. Finish quilting the Yellow Brick Road.
That should be more than enough to keep me busy for the weekend. Not that I might not pull out something else that looks interesting.
Monday, February 07, 2011
I've started sewing the Tilted stars together. I posted a picture of this quilt when I first put it up on the wall on November 8th (wow! November!), and I didn't take a new picture today before I started sewing. I'm putting 16 blocks together, so the final assembly will be 3 units wide and 4 units long. It's easy sewing; nothing matches except at the corners. All I have to do is remember which way is up, and which side is left.
I did another hour, give or take on the DWR. My fingers are starting to toughen up, but today my back was hurting some, so I didn't try to push.
That left the spring wall hanging, and it didn't get as much attention this weekend as it probably deserved, but it didn't get totally ignored. For the record, this is the way it looked at the beginning of the day:
The problem is the block in the upper right with the flowers on it. This one:
It's got sweet yo-yo flowers and dimensional leaves, and I love the way it looks. But it's the only dimensional thing on the quilt, leaving the rest of it looking a bit - well - flat. The obvious solution is to add more dimensional embellishment, but that means getting creative, and that's when my anxiety level goes up and I start sewing tilted star blocks together instead.
But I had gotten so far as to assemble a basket of fabrics and doo-dads and stuff that I thought I might be able to use some day. At some point I had made this sweet origami flower:
I think with some leaves or something around it, it will fit quite nicely into the Ohio Star block. In fact, there's a piece of lime green ribbon in there that might take ruching quite nicely. So there's the beginning of one solution.
Then I got into the drawer of yo-yo makers and got out the one that makes flower shapes. I'm thinking that 3 of those, with a couple of leaves, will nicely fill the basket. So with just an hour of work, I was able to pin a couple things onto the quilt and begin to see possibilities.
So not a finished project, but one that might be ready for sandwiching and quilting in a fairly short time. I'm hoping to find some time to work on it this week; there's another snow forecast for Wednesday, and that might help.
Saturday, February 05, 2011
I also took advantage of a nice sunny afternoon and decent light to work on the Tilted Stars. I think it's at the stage where I'm ready to call the layout "done." I can see places where I might tweak it, but it's going to be hard to come up with a layout where two blocks of the same fabric aren't at least in the same neighborhood. And the overall effect looks balanced. So it's time to quit obsessing about getting it perfect and just start putting it together. It's a kid's charity quilt after all; perfection is not a requirement. I'll take it down from the wall in 4x4 sections, photograph the sections as I lay them out on the flannel board, and hope to get them put together the same way I have them laid out now. I make no guarantees, knowing me. But I can at least try.
I did another stint on the DWR, also taking advantage of good daylight. I'm nearly to the next corner, another marker of progress. I think the plan to quilt close to the edge, then bind the quilt and secure the edges is still a good one. Maybe with forward progress on a nearly daily basis I can get there by the end of February.
That leaves just the spring wall hanging untouched of the projects planned for this weekend. And in a moment of serendipity, there was a segment on ruching on "Sewing with Nancy" this morning, a technique I have thought about incorporating into the quilt. I suspect I will not get to this project until Monday, because there will not be a lot of sewing time tomorrow, and I will probably use it to move the Christmas project off the list. Ultimately I think it will be a process of auditioning things and making choices. That means trusting my creative instincts, always difficult for me. On the other hand, I'm getting tired of seeing this at the top of my UFO pile; I'd much rather see it finished and hanging on the wall.
Friday, February 04, 2011
Thursday, February 03, 2011
I first spent about 45 minutes on the DWR. It was already nearly dark when I started, so the light was not real good, and the podcast I chose was relatively short, so 45 minutes was enough. The kitties came in to keep me company, of course, so it was a pleasant time. I do wish sometimes Bart were not so completely black; it's next to impossible to get a picture of him. I'll try again another day.
Then I went down to the studio, where the primary goal for the evening was to get more pieces cut for the Christmas project. I did that, got sewing lines marked on a bunch of pieces, sewed a couple of strips together, and generally got things ready to make an assault on this project tomorrow. Because it was already after dark, I didn't try to work on the Tilted Stars; relocating colors is definitely a daylight job. Then before I left, I got out the spring wall hanging and pinned it up where I can look at it while I sew pieces together. I still can't say I have a plan, but I'm working on one.
So that's where we are, ready for tomorrow. In the morning I will have to do some cleaning to be ready for my help in the afternoon, and do some laundry. I also will do some cooking. But there will be sewing time in between tasks, and by afternoon all those things should be done. Tomorrow there may even be pictures.
Wednesday, February 02, 2011
Here are the projects I plan to work on:
1. The Christmas gift project - I'm a little over 1/3 finished with the piecing, and I plan to be 1/3 finished by Monday night. This is not a stretch by any means. The fabrics are already on the table, although I'm nearly out of cut pieces. The piecing is pretty mindless. A good project to work on while I listen to an audiobook.
2. The Twisted Stars quilt - arrive at a "final" layout. I'm not far from there now; I just need to do some climbing to work on the upper rows. This works well in small increments. Whatever condition it's in on Monday night, I will photograph it and declare it ready for assembly.
3. The Double Wedding Ring - I still can't manage more than an hour a day of hand-quilting, but 5 days is 5 hours. Forward momentum.
4. A spring wall hanging that's been on my table for a while. It needs dimensional flowers to supplement the few that are already there. Last summer I bought a whole bunch of the new Clover yo-yo makers. It's time to get them out, along with the book on origami flowers, make some decisions, and move this project closer to done. It also satisfies the requirements of the Quilting for the Rest of Us challenge.
5. Finish quilting the Yellow Brick Road quilt that I started machine quilting a few years ago. This one is a maybe, depending on getting the other machine work done. It's about half quilted, and not very skillfully at that, so I'd like to just move it off the list. If there's anything that has a chance of being completely finished at the end of the weekend, this is it. That's the incentive to move other things along so I can set up the machine for it and work on it.
So that's the plan. Tomorrow I have Bible study in Lake Providence and I will make a Walmart run for groceries and pet supplies on the way home. Once I'm home, the retreat can begin. Today I got some work out of the way, and went into the studio long enough to clear away some of the clutter and finish up the one piece of the Christmas project that was nearly done. We won't talk about the condition of the floor or the clutter in the corners; I'll deal with that stuff when it bothers me.
Oh, and I will post pictures from time to time. Progress must be recorded and celebrated.
Tuesday, February 01, 2011
I also spent some time today quilting on the DWR. I had done a little bit last week, but today managed to put in a little over an hour on it. My goal is to have it finished by mid-May so it can be carried to Canada in the truck that will be taking a load of stuff northward. This is going to mean many days of stitching, but I think it can be done. I find this makes a nice mid-day break for me, so that has helped me figure out when I am going to fit this into my life. After lunch I can load up a podcast or an audio book, and that helps serve as a time marker, as well as entertainment. I don't want to work much more than an hour at a time until my callouses are back in working condition, as that just leads to sore fingers and unhappiness.
I reset my "yarn bank" to $0 at the beginning of the year, since I knew I had depleted the balance, and then some, in buying yarn for Christmas gifts. Since yesterday was the end of the month I added up my contributions for January, and was pleased to find that I've earned $17 in credits. At the same time I realized that I really don't need any yarn. I have plenty for a year of charity knitting, as well as some lovely yarns for gifts. So I'm not planning any yarn purchases in the near future. I'll just bank the credits and see how long I can go before I find something I just can't live without, or some clearance yarn that has to be "rescued."
Right now I'm working on a set of dishcloths for Theresa and Devan's new house. It's a little late to call them a housewarming present, but that was the original intent. They should be finished in plenty of time for MJ to take them back with her in March. I also have a baby sweater and a hat on the needles, working toward this year's charity projects.
I finally decided I'm going to make a kind of "knitting journal," using an artist's sketchbook I bought on sale last year and incorporating the ball bands I'm saving. I haven't decided what all I'm going to include in the journal yet, but I'm open to ideas.
I haven't done a lot in the quilt studio yet this year, mainly because of my health, but I did do a little stitching last week on what is now going to be a Christmas present for 2011. I'm not calling it a UFO because I never put it away and worked on something else; I just ran out of time to work on it. Since it was sitting there, it was pretty easy to just pick up and start sewing. I also have the Tilted Stars on the design wall, and I'm slowly working at getting the colors distributed more evenly and identical patterns separated from each other. That one does count as a UFO, so I have both a new project and an old one going.
My next goal is to schedule a quilting retreat for myself. I'll need to study the calendar and see when I can string together a couple of days to focus just on quilting. If I can go from Thursday evening to Saturday night, I should be able to get quite a lot accomplished, including some of the clean-up tasks I want to do.
For now I'm off to finish a dishcloth and work on a scarf. The weather is turning cold again tonight; working with wool sounds like a good idea.
Thursday, January 20, 2011
Since I've been sick, I've had little energy for anything but the essentials, so quilting hasn't even been on the horizon. I'm hoping next week to get into the studio for a few hours at least and sort of "swab the decks." Over the holidays all kinds of things got dumped in there, and it's time to clear that out and get back to working order.
I have been able to do a bit of knitting when my cough lets up for a while. I finished a second brown mobius. When I bought the yarn I thought I would need 2 skeins for 1 mobius, but after knitting up the first skein, I thought it looked just fine, so I stopped. The second one I did a little differently from the first, so it has more of a mirror image from the center out look. I don't think it makes a huge difference in the end, but I like it, and that's what counts.
I also made myself a pair of fingerless mitts. It rarely gets cold enough here for gloves, but sometimes a little extra is helpful. They're red with a pretty cable design down the back. I made them on dpn's instead of 2 circs, and there's a bit of a ladder where the needle changed, but I'm not going to fuss about it; I might if they were a gift for someone else, but not for me.
A couple of other projects are coming along, including a baby hat, a scarf, and a pair of socks. Hats for AR Children's are getting done, along with the first baby sweater for CWS. I did a little bit on the pi shawl that is one of the hold-over UFO's. And the best news is that I now have $10 in my yarn bank. Not exactly a lordly sum, but enough to buy a couple of skeins on clearance. Now I just need to get well enough to have the energy to shop.
Monday, January 10, 2011
Actually, I did a little yesterday. I tried knitting on a complicated shawl, but that was beyond my capability, so I got out some acrylic and started a hat. I finished that hat this morning. So the first of the year's charity projects is done.
Finishing the hat made me think about getting my knitting diary up to date, and going through the project bags and all that sort of thing. I frogged a pair of mittens that I didn't particularly like, and put away leftover yarn from a couple of projects. Then I decided to get out last year's lists and see what progress I'd made. Unfortunately, most of the UFO's from last year's list are still on this year's. They are things that have no particular need for completion, so they seem to get pushed to the back burner. I need to make one of this year's goals getting those things done, so they're not on the list next year.
The Yarn Bank got reset to $0 on January 1st, so getting that built back up will be necessary if I am to have any new pretties this year. I also thought I would try something new - keeping all my ball bands for the year. I have 1 so far - from a mobius I finished on the trip home. Not sure what I'll do with them, but maybe I'll think of something clever.
Time for a sit-down. I'll pick out a UFO and work on it. Then maybe I'll choose a pattern for MJ's socks. Or find some other new thing to work on. At the very least there's a baby sweater to cast on. Tomorrow I need to get back to work, so I plan to take advantage of this day of convalescence.
Monday, January 03, 2011
The one kind of funky thing I've decided to do for this year is to keep the ball bands from all the yarns I use. I think it will be interesting to see how many new skeins I use this year, and what gets made from them. I have the ongoing hat and baby sweater charity knitting, but no specific goals beyond that, other than to try not to be finishing Christmas gifts on New Year's Day. I know I chose a lot of colorwork projects this year, and they naturally go slower than some other types of knitting. I'll try to remember to compensate for that next year.
When I get home there will be quilty things going on as well. I'll have to start by digging out the studio. Then we'll see what's next. Meanwhile I'm going to watch the sky get brighter for a while, then I'm going to hunt for a comfy sofa and a dog to keep me company.
Monday, November 15, 2010
This is the time of year when I distribute all the things I have been working on all year. Some churches have an "ingathering" in the fall to gather together all the projects various mission groups have been working on. I have an "outgoing."
Today I did the first drop-off of 44 hats for the Knitting for Noggins project at Arkansas Children's Hospital (http://www.archildrens.org/volunteer/Knitting_for_Noggins.asp). I take my hat to a very special yarn shop in Arkadelphia that serves as a gathering point for lots of charity projects and sells fair trade goods. Knit Unto Others ( http://www.knituntoothers.com/) has lots of great yarn, but more than that, is a place that invites you to have a seat at the table and just hang out and knit for a while.
Today I was smarter than usual, and determined that my visit to the shop was my only goal for the day. That meant I could spend all the time I wanted, without a need to rush off to some other place. Let's just say I went in with two bags of hats and came out with two bags of yarn. I'm on my way to well-stocked for Christmas knitting.
Tomorrow I'm off to Little Rock for the second drop-off. This one is a church-wide effort to create layette kits for newborns. The hard part of the kits, at least in the warm climate where we live, is the little sweater; they simply can't be bought around here for less than $20.00. So I promised the church that I would provide sweaters for the kits they create. This year they outdid themselves; I was prepared to knit 20 sweaters, and ended up needing 30. Amy helped by sending me 3 from her stash, so we were able in the end to complete 28 kits, with a few things left over for next year. In addition, 8 of our kits went out with handmade blankets in them. One of my parishioners loves to crochet baby blankets, and we love for her to do it.
I love watching the hats and sweaters pile up in my yarn through the room. A kitty litter pail full and labeled makes my heart feel good. But even better is the process of emptying them all at the end of the year. It means that all those stitches are on their way to the people that need them, which was the point in the first place. And of course, they go with my prayers. Whether for the child patients at Arkansas Children's or the tiny newborns that go home wrapped in one of Diane's blankets, lots of prayers go with the garments.
Maybe, when all is said and done, it's the prayers that are really the point.